PROJECT COMPLETED
Sr.
No.
PROJECT DESIGNATION / CODE PROJECT PERIOD DESCRIPTION OF SERVICES PROVIDED CLIENT LOCATION

1.

IMR Project

09 June 2012 - Ongoing

Inspection, Maintenance and repair Services using ROV and Air Diving (DP2Vessel)

PHE ONWJ

Java Sea – Indonesia

2. Diving Services December 2010 – Ongoing Diving Services TOTAL E&P INDONESIE East Kalimantan
3. IMR Project Ongoing Inspection, Maintenance, repair using ROV and Air Diving TAC PERTAMINA Natuna Sea
4. Saturation and Air Diving Services 25 April 2012 - . 17 May 2012 Metrology Pipeline, Riser and Spool Tie In SMIT – PT. PUNJ LLOYD INDONESIA Java Sea - Indonesia
5. IMR Project Ongoing Inspection, Maintenance, repair using ROV and Air Diving CONOCO PHILLIPS Natuna Sea
6. Air Diving Services 2011 – 2013 11 April 2012 – 21 April 2012 Air Diving Services (Onshore) CONOCO PHILLIPS Ramba Jetty, Palembang – Indonesia
7. Provision of Emergency Call Off Air Diving and ROV Services 22 March – Ongoing Diving Services and ROV for pipeline Repair, Clam Installation PHE ONWJ Java Sea
8. Provision of ROV Services 10 December 2011 – 01 February 2012 ROV visual survey and Conduct visual survey using ROV Navajo PT. Warma Trierindo Madura – East Java
9. Provision of ROV Services 27 October 2011 – 26 November 2011 ROV Services for Observation and Inspection PT. Punj Llyod IndonesiaI Java Sea – Indonesia
10. Pipelay Project 04 October 2011 – 03 December 2011

Saturation and Air Diving for pipelay Project

Kodeco Surabaya
11. Provision of ROV Services 24 September 2011 – 01 October 2011 ROV Services PT. Seascape Indonesia Balikpapan
12. Air Diving Services 2011 – 2013 07 September 2011 – 24 September 2011 Air Diving Services CONOCO PHILLIPS Natuna Sea – Indonesia
13. Provision Emergency Air Diving and ROV Spread Services 26 July 2011 – 21 August 2011 Diving Services and ROV for pipeline Repair, Cable Survey & Debris Removal PHE ONWJ Java Sea – Indonesia
14. Emergency for Air Diving and ROV Services for Zud Riser Repair 18 May 2011 – 11 June 2011 Diving Services and ROV for pipeline Repair and Cable Survey PHE ONWJ Java Sea – Indonesia
15. Emergency for Air Diving and ROV Services 15 April 2011 Air Diving and ROV for Pipeline Repair PHE ONWJ Java Sea – Indonesia
16. Emergency Air Diving and ROV Services for Debris Removal March 2011 Air Diving And ROV For Debris Removal PHE ONWJ Java Sea – Indonesia
17. SATURATION & AIR DIVING SERVICES FOR Belanak LPG FSO Calm Buoy Recovery Work January 2011 – March 2011 Air & Saturation Diving Services ConocoPhillips Indonesia Natuna Sea – Indonesia
18. Diving Services December 2010 – Ongoing Diving Services Total E&P Indonesie East Kalimantan
19. Air Diving Services July 2010 – September 2010 Pipeline and Riser Repair Petrochina International Jabung Ltd Jambi - Indonesia
20. Pertamina / ONWJ Pipeline repair / Java May 2010 – July 2010 Air Diving Support for pipeline repair / replacement PHE ONWJ Java Sea - Indonesia
21. Pertamina / BP ONWJ Pipeline repair / Java December 2009 – May 2010 Air Diving Support for pipeline repair / replacement CATHEM / Pertamina Java Sea – Indonesia
22. Heera Redevelopment Project-Phase-II October 2009 – May 2010 Saturation Diving and Mix-gas Diving Support for Pipeline, Riser Clamp, conductor, subsea spool, composite cable installation onboard Barge Madhawa and Barge Mahesh Oil & Natural Gas Corp.Ltd / Punj Lloyd India India
23. Heera Redevelopment Project-Phase-II October 2008 – May 2009 Riser installation, Sub Sea Spool Tie-in, Removal of installation aids (Piles, trunion, etc) and Survey Job. Oil & Natural Gas Corp.Ltd/ Punj LIoyd India India
24. Heera Redevelopment Project-Phase-II January 2008 – May 2008 Air Diving support for Pipeline, riser Clamp, conductor, subsea spool, composite cable installation onboard Barge-Shiva Oil & Natural Gas Corp.Ltd/ Punj LIoyd India India
25. Pipeline Crossing rectification Works June 2007 BP Crossing Support rectification works for South Sumatera West Java Gas pipeline Phase II LIKPIN/PGN Java Sea - Indonesia
26. Rental Equipment January 2007 – April 2007

Air-Mix Gas Diving Equipment rental

Offshore Logistic Asia Pacific Java Sea - Indonesia
27. Rental Equipment 2006 – 2007 Pipeline Subsea tie-in and Barge Support Air/Mix Gas Diving Equipment Adsun Offshore / Punj LIoyd India
28. Diving Services December 2005 – March 2007 Provided Diving Services Offshore Subsea Malaysia
29. Diving Services November 2005 - January 2006

Provided Diving Services ( Personnel / Manpower) for Various IMR and Construction Projects

Unidive Singapore Vietnam
30. ROV Services June 2005 ROV Services for RIG Atwood Beacon Conoco Phillips Natuna Sea - Indonesia
31. Diving Services March 2005 – July 2007 Provided Diving Services (Personnel / Manpower) for Various IMR and Construction Projects Hallin Marine - Singapore Thailand
32.. Diving Services January 2005 – May 2007

Provided Diving Services (Personnel / Manpower) for Various IMR and Construction Projects

Hallin Marine - Singapore Malaysia
33. Technical Support to TNI Indonesia (NAVY) January 2005 Refurbish & Orientation of HAUX Bell Bounce System TNI Indonesia Surabaya - Indonesia
34. Diving Services December 2004 – Sep 2005 Provided Diving Services (Personnel / Manpower) for Various IMR and Construction Projects Hallin Marine Singapore China
35. Diving Services November 2004 – March 2005

Provided Diving Services (Personnel / Manpower) for Various IMR and Construction Projects

Hallin Marine Singapore India
36.. SW Platform October 2004 Pipeline leak repair using Plidco Clamp Unocal 76 / Dwisatu Mustika Bumi Balikpapan, Indonesia
37. Sepingan 'V' Pipeline September 2004 – October 2004

Pipeline, Clamp & Riser Installation

Unocal 76/ Dwisatu Mustika Bumi Balikpapan - Indonesia
38. Diving Services March 2004 – April 2007 Provided Diving Services (Personnel / Manpower) for IMR for Brunei shell Petroleaum Mastertech Singapore Brunei
39. Diving Services March 2004 – April 2007 Provided Diving Services (Personnel / Manpower) for Various IMR and Construction Projects Allied Marine Sdn.Bhd Malaysia
40. Tunu Phase 9 Project November 2003 – December 2004

Pipeline, Clamp Platform & Anode Installation. Trenching (P/L Burial)

TOTAL Indonesia / Punj LIoyd Indonesia Samarinda, Indonesia
41 PGN Paneran to Pemping 28" Pipeline March 2003 – June 2003

Pipeline Installation & free span correction (Seatrut grout bags)

PGN / Punj LIoyd Indonesia Dharti Dredging Batam Island, Indonesia