Our Experiences
Following are the reference, PT. Advanced Offshore Services has successfully completed platform inspection, pipeline repair and other under water maintenance job utilising Saturation Diving, ROV and Surface Supplied air and mixed gas Diving Technique in Indonesia and overseas.
2024
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of Diving Services for Medco Terubuk project | 12 August 2024 - Ongoing | Saturation and Air Diving Services to support Jacket support works by the air divers, Pre-commissioning Support, Riser Clamps Installation, Riser Installation, Subsea Spool Installation, PLEM Installation, Pipeline installation and others. | PT. Timas Suplindo (Medco E&P Natuna Ltd ) | Natuna Sea |
Provision of Saturation & Air Diving Services Onboard EP-300 for Engineering, Procurement, Construction and Installation for West Belut Project | 23 July 2024 – 17 September 2024 | Saturation and Air Diving Services to support Painting Repair at Jacket leg, Spool Installation, Pipeline Pre-com (FCG), Dewatering and N2 Purging Assisting for Pipeline Pre-com, PLET installation, Post Lay Survey – Spool Installation, Pipeline and Umbilical Cutting and Removal. | PT. Meindo Elang Indah (Medco E&P Natuna Ltd ) | Natuna Sea |
Provision of Air Diving Services for West Belut Project Onboard EN-3000 | 12 July 2024 – 07 August 2024 | Air Diving Services onboard DLB EN600 for Pipeline Installation such as Stinger Check, Assistance to Marine Spread (Contingency), and Cutting Sling of Norwegian Buoy Start Up Head and Laydown Head | PT. Meindo Elang Indah (Medco E&P Natuna Ltd ) | Natuna Sea |
Provision of SAT and Air Diving Services onboard T1201 | 10 June 2024 – 19 August 2024 | Saturation and Air Diving Services to support Jacket, Spool & Riser Installation, Free span Correction, Debris Removal and Pre-commissioning Support. | PT. Timas Suplindo (MMHE) | Gulf of Thailand |
Provision of Diving Spread for Gansar Project | 22 February 2024 - 7 May 2024 | Saturation and Air Diving Services to Support Riser and Riser Clamps Installation, Subsea Spool Installation, Jacket Support Works and Pre-Commissioning Support | PT. Timas Suplindo (Petronas Carigali Sdn. Bhd.) | South China Sea |
2023
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of ROV Services for Subsea Operations for EPRO-NGLJ & FPRO-ECOM Pipeline Project | 09 November 2023 - 18 December 2023 | ROV services for Pre-Installation survey of jacket face / riser guard etc. Monitoring of riser clamp while lowering and putting on desired location. Monitoring of riser installation / sections while lowering and transfer to static rigging. Monitoring riser positioning into the clamps, Continuous monitoring of pipeline lowering after bow string cut, Monitoring during mattress and spool lowering , As built survey of mattress installation, spool installation and As-build video of riser and spool installation | PT. Meindo Elang Indah (PHE ONWJ) | Java Sea |
Provision of Saturation & Air Diving Services for EPRO-NGLJ & FPRO-ECOM Pipeline Project | 05 November 2023 - 26 January 2024 | Saturation and Air Diving Services for Riser Clamp and Retrofit Riser Installation, Installation of Riser Base and Mid-Line Spool Tie-in | PT. Meindo Elang Indah (PHE ONWJ) | Java Sea |
Provision of Saturation Diving Services for EPC Medco Forel Bronang Project | 28 July 2023 - 05 August 2023 | Saturation Diving Services onboard EP-300 at Forel & Bronang Platform for Subsea Spool Instalation | PT. Meindo Elang Indah (Medco E&P Natuna Ltd.) | Natuna Sea |
Provision for SAT Diving Services for Medco Bronang Project | 01 July 2023 - 02 September 2023 | Saturation Diving Services onboard DLB-01 for Subsea Spool Installation at Forel & Bronang | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Natuna Sea |
Air Diving Services for Forel & Bronang Project | 12 June 2023 - 08 July 2023 | Provision of Air Diving Services for Pipeline Laying | PT. Meindo Elang Indah (Medco E&P Natuna Ltd.) | Natuna Sea |
Air Diving Services (5th Campaign) | 07 June 2023 - 23 September 2023 | Provision of Air Diving Services for Class UWILD for FPSO “Belanak Natuna” | Medco E&P Natuna Ltd. | Natuna Sea |
Provision of ROV services for MAC Field Development Project Husky-CNOOC Madura Limited | 15 March 2023 - 16 May 2023 | Provision of ROV Services onboard EP300 for Shim Plate Installation | PT. Meindo Elang Indah (Husky CNOOC Madura Limited) | Madura Sea |
Provision for SAT Diving Services for MAC Field Development Project Husky-CNOOC Madura Limited | 13 March 2023 - 15 May 2023 | Provision of SAT Diving Services onboard EP300 for Shim Plate Installation | PT. Meindo Elang Indah (Husky CNOOC Madura Limited) | Madura Sea |
2022
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of Air Diving Services for Medco Forel and Bronang Closure of Bolt Holes on Conductor Project | 06 December 2022 - 14 January 2023 | Provision of Air Diving Services for assisting hole recovery job in Natuna Sea. | PT. Meindo Elang Indah (Medco E&P Natuna Ltd.) | Natuna Sea |
Provision of SAT Diving Services for PTTEP Zawtika 1D Development Project | 16 November 2022 - 16 January 2023 | Provision of Saturation Diving services onboard T1202 to support installation activities including but not limited to Tie In Installation. | PT Timas Suplindo (Main Contractor: PT Gunanusa Utama Fabricators Company: PTTEP International Limited) | Zawtika Field, Myanmar |
Provision of Air Diving & ROV Services Onboard EN-3000 for EPCI for YY Field Dev Optimization Project PT PHE ONWJ | 03 October 2022 - 04 November 2022 | Provision of Air Diving and ROV Services onboard DLB EN-3000 for pipeline & jacket installation assistance. | PT. Meindo Elang Indah (PT Pertamina Hulu Energi ONWJ) | Java Sea |
Provision of Diving Services (3 years contract) | 15 September 2022 - Ongoing | Provision of Air Diving and ROV Services within any of PHM facilities for all underwater inspection and installation works. | PT Pertamina Hulu Mahakam | East Kalimantan |
Provision of Air Diving Services Onboard EN-3000 for Engineering, Procurement and Construction for Medco Forel Bronang Project Medco E&P Natuna Ltd. | 03 August 2022 - 15 September 2022 | Provision of Air Diving Services onboard DLB EN-3000 for jacket installation assistance, activate flooding and vent valves during WHP jacket Forel and Bronang. | PT. Meindo Elang Indah (Medco E&P Natuna Ltd.) | Natuna Sea |
Air Diving Services | 15 June 2022 - 19 July 2022 (4th Campaign) | Provision of Air Diving Services for Support Belanak Oil Offloading Buoy (OOB) Class UWILD and Belida DPPA 12” Oil Riser Coating Repair | Medco E&P Natuna Ltd. | Natuna Sea |
Provision for Air Diving Services for MAC Field Development Project Husky-CNOOC Madura Limited | 11 June 2022 - 12 July 2022 | Provision of Air Diving Services onboard DLB Eka Nusantara 3000 for stinger check and jacket installation assistance | PT. Meindo Elang Indah (Husky-CNOOC Madura Limited) | Madura Sea |
Provision of Air Diving Services for Bekapai-3 Surface Facilities Modification and Dogleg Installation | 1st Phase: 16 May 2022 - 14 July 2022 2nd Phase: 08 October 2022 - 21 November 2022 | Provision of Air Diving Services to carry out the underwater work for pipeline modification on other required installation related to Underwater survey, pipeline modification work with cutting the existing & installation of expansion loop from MWP BE to WMP BA platform, anode installation for the pipeline from MWP BE to MWP BA platform, and MWP BH to MWP BG Platform, Jacket & underwater work, installation for new anode, conductor guide framing, bracing reinforcement, new boat landing, riser protection frame & V-Shape landing, demolition work for existing facility MWP-BE & MWP BH. | PT Asta Rekayasa Unggul (PT Pertamina Hulu Mahakam) | Bekapai Field, East Kalimantan |
Provision of SAT and Air Diving Services Onboard T1201 for Medco Hiu Project | 1st Phase: 05 May 2022 - 27 June 2022 2nd Phase: 24 July 2022 - 10 August 2022 | Provision of Saturation and Air Diving Services 24 hours operation for Vessel T1201 installation activities related to J-Tube Installation, Install & Close J-Tube clamp and tightening, Spool metrology survey, spool installation, Flexible lift & shift, flexible tie-in, flying leads installation, support subsea intervention for grout bag installation, debris removal from seabed (contingency only), remove flexible start-up & laydown head. | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Hiu Field, Natuna Sea |
Provision of SAT and Air Diving Services onboard T1201 for Medco Belida Project | 1st Phase: 28 June 2022 - 23 July 2022 2nd Phase: 11 August 2022 - 27 August 2022 | Provision of Saturation and Air Diving Services 24 hours operation for Vessel T1201 installation activities related to support installation activities Riser installation, close riser clamp and tightening, spool installation and spool metrology survey. Pipeline pre-commissioning, install & recovery temporary pig launcher, connect hose to temporary pig launcher/temporary blind flange. Support subsea intervention for grout bag installation and free span correction (if any). Debris removal from seabed (contingency only), Remove start-up & laydown head | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Belida Field, Natuna Sea |
Provision of Air Diving Services onboard DLB-01 for Medco Belida Project | 1st Phase: 13 April 2022 - 24 June 2022 2nd Phase: 18 July 2022 - 15 August 2022 | Provision of Air Diving Services for Onboard DLB-01 for Pipeline Installation and Jacket Installation. To support installation works for Stinger & Hinge Condition check including its roller, Camera, Air/Water Hoses, Connection Pins, and critical bolt connections. Stinger & Pipeline profile Check Intervention with manual valves on stinger for ballasting / de-ballasting (Contingency only), As contingency for cutting/ open trunnion pin, Survey Riser Clamp/ Guide Sleeve, Remove any rope / fishing nets entangled with AHT propellers (contingency only). | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Belida Field, Natuna Sea |
2021
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision ROV Observation for Support JSN Saturation Job | 18 November 2021 - 26 April 2022 | Provision ROV Observation for Support JSN Saturation Job | PT. Meindo Elang Indah (PT Pertamina Hulu Mahakam) | Sisi Nubi and South Mahakam Field, East Kalimantan |
Provision of SAT Diving Services for Medco Belida Project | 02 November 2021 - 14 November 2021 | Saturation Diving Services onboard Crest Odyssey-1 for installation activities related to Pipeline spool dismantling and Riser Testing. Removal of spool piece & wet store and Installation of blind flange. | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Belida Field, Natuna Sea |
Provision of SAT Diving Services for Medco HIU Project | 15 November 2021 - 28 November 2021 | Saturation Diving Services onboard Crest Odyssey-1 for installation activities related to EDU & SCM replacement and flying leads installation. Removal of flying leads prior to EDU & SCM replacement & reinstatement afterwards. Removal of existing EDU & SCM and Installation of new units. | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Hiu Field, Natuna Sea |
Provision for Saturation & Air Diving for Subsea Works for Engineering, Procurement, Supply, Construction and Commissioning Contract for North Sisi North Nubi and Jumelai Project PT Pertamina Hulu Mahakam | 13 November 2021 - 27 April 2022 | Saturation Diving Services onboard Accommodation Work Barge (Subsea Spool Installation and Riser Clamp Installation) at JML-1, WPS-3, MWPS, WPN-4, and WPS-2 platform. Saturation diving activities shall cover supporting for pipeline flooding / preservation, disconnect 85T shackle and sacrificial wire 60mm from pipeline head, dismantle & recover temporary flange protector, take fix position using USBL for position, Subsea spool metrology, pipeline head dismantle, bottom riser flange recovery, subsea spool installation, Kamos test and for others spool installation. | PT. Meindo Elang Indah (PT Pertamina Hulu Mahakam) | Sisi Nubi and South Mahakam Field, East Kalimantan |
Air Diving Services | 03 November 2021 - 30 November 2021 (3rd Campaign) | Air Diving Services for Support Belanak Oil Offloading Buoy (OOB) floating hose Maintenance Program 2021. | Medco E&P Natuna Ltd. | Natuna Sea |
Provision for Air Diving System Onboard KP-1 for Engineering, Procurement, Supply, Construction and Commissioning Contract for North Sisi North Nubi and Jumelai Project PT Pertamina Hulu Mahakam | 09 October 2021 - 16 January 2022 | Air Diving Services onboard DLB Armada KP1 for Pipeline Installation, Stinger check 3 pipeline segments (JML-1 to MD-1 7 km, WPS3 to MWPX 4,3 km, WPN4 to WPS2 5 km), Assistance to Marine spread, Air diving assistance to be required for cutting the rope which attached to the sling that wrap Norwegian buoy in start-up head and laydown head after pass the stinger. | PT. Meindo Elang Indah (PT Pertamina Hulu Mahakam) | Sisi Nubi and South Mahakam Field, East Kalimantan |
Provision of Air Diving Onboard EN3000 Transportation and Installation of Dai Nguyet Wellhead Platform (DN-WHP), Flexible Pipeline & Subsea Cable PTSC Mechanical and Construction Limited Company | 12 August 2021 - 27 September 2021 | Air Diving Onboard EN3000 for DN Jacket Installation Assistance, Air diving may require to assist jacket installation and other tasks instructed by CONTRACTOR Barge Superintendent up to WD within air diving capability. Assistance to Marine Spread (Contingency), Air diving assistance shall be available during jacket installation which will be laid by DLB Eka Nusantara 3000. | PT. Meindo Elang Indah (Idemitsu Gas Producation (Vietnam) Co. Ltd) | Nam Con Son Basin, Vietnam |
Provision for Air Diving and ROV Operation Onboar EN3000 for Engineering, Procurement, Supply, Construction and Commissioning Contract for North Sisi North Nubi and Jumelai Project PT Pertamina Hulu Mahakam | 12 April 2021 - 30 May 2021 | Air Diving and ROV Observation Services onboard EN3000 for jacket installation assistance, flooding system removal, assistance to marine spread (contingency), Jacket pre-installation survey using ROV, ROV monitoring assistance during jacket lifting and Jacket post installation survey (anodes, mud mat and riser clamps) | PT. Meindo Elang Indah PT Pertamina Hulu Mahakam | Sisi Nubi and South Mahakam Field, East Kalimantan |
Provision for Air Diving System and Work Class ROV Operation Onboard KP-1 for Provision of Engineering, Procurement, Construction, Installation and Commissioning of BTJT-B Wellhead Platform, Infield Pipelines and Host Tie-In Modification for Bukit Tua Phase 2B Development Project PC Ketapang II Ltd | 03 April 2021 - 06 September 2021 | Air Diving and Work Class ROV Services onboard KP-1 for Pipeline Installation, stinger check, assistance to marine spread, cutting the rope which attached to the Sling of Norwegian Buoy at 6” startup head and laydown head, pipeline profile checks and pipeline touchdown monitoring, cutting sacrificial sling and recovery of beacons installed on pipeline after final lay down. | PT. Meindo Elang Indah (PC Ketapang II Ltd) Under PGN-SAKA Indonesia Pangkah Limited) | Bukit Tua Field, Madura Sea |
Provision of Engineering, Procurement, Construction, Installation, and Commissioning of BTJT-B Wellhead Platform, Infield Pipelines and Host Tie-In Modification for Bukit Tua Phase 2B Development Project PC Ketapang II Ltd | 09 February 2021 - 31 March 2021 | Air Diving and ROV Observation Services onboard EN3000 for Jacket Installation assistance, flooding system removal, assistance to marine spread (contingency), Jacket pre-installation survey using ROV, ROV monitoring assistance during jacket lifting and Jacket post installation survey. | PT. Meindo Elang Indah (PC Ketapang II Ltd) | Bukit Tua Field, Madura Sea |
Provision of Saturation Diving Services for Merakes EPCI-2 Tie-In Scope (Merakes Technip) | 06 February 2021 -12 March 2021 | Provision of Saturation Diving Services for Merakes EPCI-2 Tie-in Scope (Merakes Technip) Support Services for Divers Tie-in operations, Flexible Riser Pigging and Flooding & Flying Leads Installation by Divers) | PT. Timas Samudera Indonesia (Technip FMC-Under ENI East Sepinggan Ltd) | The East Sepinggan Block, Merakes, East Kalimantan |
Provision of SAT Diving Services for ENI Merakes EPCI-4 TSJV Project | 21 December 2020 - 05 February 2021 | Provision of Saturation Diving Services for ENI Merakes EPCI-4 TSJV Project EPCI-4 (Provision and Installation of Pipeline, ILT, PLETs & Pre-commissioning Activities). | PT. Timas Samudera Indonesia (ENI East Sepinggan Ltd) | The East Sepinggan Block, Merakes, East Kalimantan |
Saturation Diving Services for Crane Boom Recovery | 25 November 2020 - 18 February 2021 | Provision of Saturation Diving services for recovery LTS3000 crane boom salvage | T&T Salvage Asia Pte. Ltd. | Mumbai High, India |
2020
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of SAT Diving Services for PHM South Mahakam Project | 11 November 2020 - 20 December 2020 | Provision of SAT Diving Services for Subsea spool installation at JM-1 platform and SPG Platform for remove temporary star-up head and laydown head, flooding pipeline and flooding riser, spool metrology survey, Tie-ins spool and Kamos Gasket Installation and Install permanent flange protector. | PT. Timas Suplindo (PT. Pertamina Hulu Mahakam) | Refinery RU V, South Mahakam |
Provision of Air Diving Services for PGN Hafar SAKA Sidayu Project | 29 October 2020 – 05 December 2020 | Provision of Air Diving Services for clean up marine growth from existing subsea conductor, prior to jacket installation. Assistance to install conductor sleeves on existing subsea conductor, prior to jacket installation. Assistance to guide jacket setting unto the existing subsea conductor. Assistance to connect Jacket securing rope after Jacket setting (Contingency). Seabed Survey prior to installing Jacket, including debris removal. Inpsect Jacket Mudmat after setting on seabed. Jacket as-built & anode survey. | PT. Timas Suplindo (PT. Hafar Daya Konstruksi Under PGN-SAKA Indonesia Pangkah Limited) | Ujung Pangkah Field, East Java |
Provision of SAT Diving Services for Kangean Valve Rectification Project for TSB 2 Project | 09 October 2020 – 18 October 2020 | Provision of Saturation Diving Services for valve intervation at Batur In-Line-Tee, 10in Inline leaking valve rectification | PT. Timas Samudera Indonesia (Kangean Energy Indonesia Ltd.) | TSB Field, Kangean |
Provision for Air Diving and ROV Operation Onboard EN3000 for Transportation and Installation PHE-12 Reactivation Project PT. Pertamina Hulu Energi West Madura Offshore | 04 September 2020 - 20 October 2020 | Provision of Air Diving Spread and ROV Spread for assisting in installation of PHE 12 Platform at PHE WMO field Madura. Removal of jacket horizontal lifting sling from the jacket trunnion, pre-installation survey, assist to monitoring boat landing and jacket installation, post installation survey (clearance seabed survey, debris survey). | PT. Meindo Elang Indah (PT. Pertamina Hulu Energi West Madura Offshore) | Madura Sea |
Provision of Management and Engineering Services Consultations for Saturation Diving System at Dai hung Field, Block 05-1A | 14 September 2020 - 03 November 2020 | Management and Engineering Research, Inspections and Consultation for Saturation Diving Project | Thien Nam Offshore Services JSC (TOS) (Petro Vietnam Gas (PVGAS)) | Dai Hung fields |
Provision of SAT Diving Services for ENI Merakes EPCI 4 Shallow Water Pre Commissioning Project | 19 August 2020 – 8 October 2020 | Provision of SAT Diving Services for ENI Merakes EPCI-4 Shallow Water precommissioning Project, Pipeline precommissioning works and Free span correction for Eni East Sepinggan Ltd. | PT. Timas Samudera Indonesia (ENI East Sepinggan Ltd) | The East Sepinggan Block, Merakes, East Kalimantan |
Provision of Diving Services for Kris Energy Apsara Project | 16 August 2020 – 18 September 2020 | Provision of Inspection, Certification, Rig Up & Air Diving Personnel for Air Diving Equipment and Services for Kris Energy Apsara Project | PT. Timas Suplindo (Kris Energy Ltd) | Apsara Field, Cambodia Block A located on the Khmer Basin offshore Cambodia |
Air Diving Services | 01 August 2020 – 30 August 2020 (2nd Campaign) | Air Diving services for support of Belanak Oil Offloading Buoy (OOB) Repair Project | Medco E&P Natuna Ltd. | Natuna Sea |
Provision of Management and Engineering Services Consultations for Saturation Diving System at Dai hung Field, Block 05-1A | 18 July 2020 - 04 August 2020 | Management and Engineering Research, Inspections and Consultation for Saturation Diving Project | PTSC Offshore Services Joint Stock Company (POS) for PetroVietnam Domestic Exploration Production Operating Co. Ltd (PVEP POC) | Dai Hung fields |
Air Diving Services | 18 July 2020 – 17 August 2020 (2nd Campaign) | Air Diving Services for FPSO “Belanak Natuna” UWILD (Under Water Inspection in-lieu Dry-docking | Medco E&P Natuna Ltd. | Natuna Sea |
Provision of Diving Services for Ophir Meliwis Offshore Pipeline and WHP Installation Services. | 15 March 2020 – 27 March 2020 (3rd Phase) | Provision of Saturation Diving services and Air Dive support for Offshore pipeline and WHP installation services (Pipeline Leak Rectification Work) | PT. Timas Suplindo (Santos (Madura Offshore) Pty. Ltd) | Madura Sea |
Provision of Inspection Reporting Services for UWILD-FPU Jangkrik Balikpapan | 19 February 2020 -10 March 2020 | Inspection reporting services for UWILD FPU Jangkrik Balikpapan | PT. Bintang Subsea Indonesia (ENI Muara Bakau B.V) | FPU Jangkrik, Balikpapan |
Provision of Diving Services for Medco EP Natuna – Buntal #5 Project | 7 February 2020 – 7 March 2020 (2nd Phase) | Saturation Diving personnel and supporting tools for Spool installation, HFL & EFL installation (Flying lead), Concrete Mattress installation, Assistance for Commissioning and Start-up, Replacement of Existing EFL, Installation sand bags for repair support below existing spool, Leak identification Underwater Survey. | PT Timas Suplindo (Medco E&P Natuna Ltd.) | Natuna Sea |
Provision of Diving Services for Ophir Meliwis Offshore Pipeline and WHP Installation Services. Maintenance and Repair (Air Diving) | 18 January 2020 - 29 February 2020 (2nd Phase) | Saturation and Air Diving services for Offshore Pipeline and WHP Installation Services (Pipeline Leak Rectification Work)personnel on DP 2 Vessel SMS Supporter | PT Timas Suplindo (Santos (Madura Offshore) Pty. Ltd) | Madura Sea |
2019
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Underwater Inspection Services | 22 November - 27 November 2019 | Air Diving and ROV services on DP2 Vessel Endeavour for underwater inspection and pipeline visual inspection and free span. | Husky-CNOOC Madura Limited (HCML) | Madura Strait |
Provision of Diving Services for Ophir Meliwis Offshore Pipeline and WHP Installation Services. | 12 October 2019 - 24 December 2019 (1st phase) | Saturation and Air Diving services for Offshore Installation of the Meliwis WHP Jacket, pipeline installation, riser and spool installation. | PT Timas Suplindo (Santos (Madura Offshore) Pty. Ltd) | Madura Sea |
Provision of Diving Services for Medco EP Natuna – Buntal#5 Project | 31 October 2019 - 30 November 2019 (1st phase) | Provision of saturation personnel and tools for cutting existing umbilical, installation of concrete mattress, installation of Buntal-5 UTA, spool metrology and installation of flange shroud protectors. | PT Timas Suplindo (Medco E&P Natuna Limited (MEPN)) | Natuna Sea |
Provision for Air Diving and ROV Services for EPC Perbaikan SPL 20” Penajam, Tahun 2018 RU V Balikpapan PERTAMINA RU V | 01 August 2019 - 02 February 2020 | Air Diving and ROV services for Pipeline repair | PT. Meindo Elang Indah (Pertamina RU V Balikpapan) | Penajam, Balikpapan |
Air Diving Services | 31 August 2019 - 04 October 2019 (1st Campaign) | Air Diving services on Non-DP Vessel Hailey Sarah for 12” Riser repair and Inspection of FPSO Belida | Medco E&P Natuna Ltd. | Natuna Sea |
Provision of Air Diving System and Personnel | 13 April 2019 – 14 Mei 2019 | Air Diving Services and SRP to support commissioning summit LNG Offshore terminal | Integrated Subsea Solutions PTE Ltd | Moheshkhali Island, Bangladesh |
Diving and Related Services for Subsea Inspection, Maintenance and Repair (Air Diving) | 06 May 2019 – 02 August 2019 (2 nd Phase) | IRM Project using Air Diving and ROV Equipment and personnel on DP 2 Vessel SMS Supporter | PHE ONWJ | Java Sea |
2018
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of Air Diving and ROV Support Services for Pipeline Repair | 24 November 2018 – 28 December 2018 | Air Diving and ROV services for pipeline repair | PT. Offshore Services Indonesia (PHE ONWJ) | Java Sea |
Provision of ROV Services for PRRP Project at PHE ONWJ | 7 November 2018 – 22 November 2018 | ROV support services for pipeline replacement project | PT. Meindo Elang Indah (PHE ONWJ) | Java Sea |
Provision of Diving Saturation Service for CATAM Oil Field Development Project | 17 September 2018 – 16 October 2018 | Provision of Saturation Diving Personnel for Spool Tie In Installation | Consortium with Thie Nam Offshore Services (JSC) – PetroVietnam Man Power Training College (PVMTC) For Vietsopetro Vietnam | Catam Oil Field, Vietnam |
Provision of Air Diving on board Kalinda for Pabelokan – Gas Metering Station(GMS) 20” Pipeline CNOOC Ses Ltd. | 8 October 2018 – 4 December 2018 | Air Diving Services for pipeline repair and replacement activities | PT. Meindo Elang Indah (CNOOC Ses Ltd) | Java Sea |
Provision of Diving Services for Fabrication and Installation of Clamps for conductors of 21XP 23XP wells at Dai Hung Field | 31 July 2018 – 18 August 2018 | Provision of Saturation Diving Personnel and SAT system maintenance using Saturation Diving Systems -10 (SAT-10) for clamp installation | Consortium with Thie Nam Offshore Services (JSC) – PetroVietnam Man Power Training College (PVMTC) For PetroVietnam Domestic Exploration production Operating Company Limited | Dai Hung, Vietnam |
Diving and Related Services for Subsea Inspection, Maintenance and Repair (Air Diving) | 08 March 2018 – 4 October 2018 (1 st Phase) | IRM Project using Air Diving and ROV Equipment and personnel on DP 2 Vessel SMS Supporter | PHE ONWJ | Java Sea |
2017
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
ROV SYSTEM AND SUPPORT TECHNICIANS | 16 December – 31 December 2017 | ROV Semi Work Class Supermohawk & ROV Mojave for IMR project support | PT. PATRA DINAMIKA (PHE WMO) | Madura Sea |
Provision of SAT Diving Services for Star Energy – KG & KH Riser Replacement Project | 07 October 2017 – 27 October 2017 | Saturation Diving support for Riser Replacement project | PT. TIMAS SUPLINDO (STARENERGY) | Natuna Sea |
Provision of Air Diving Services onboard DLB01 for Star Energy KG & KH Riser Replacement Project | 01 October 2017 – 25 October 2017 | Air Diving support for Riser Replacement project | PT. TIMAS SUPLINDO (STARENERGY) | Natuna Sea |
Provision of SAT Diving Services for PHE ONWJ Pipeline Replacement Project | 09 August 2017 – 22 September 2017 | SAT Diving Services for Pipeline and Subsea Spool Installation | PT. TIMAS SUPLINDO (PHE ONWJ) | Java Sea |
Provision of Air Diving Services onboard DLB01 for PHE ONWJ Pipeline Replacement Project | 21 August 2017 – 14 September 2017 | Air Diving Services for Pipeline and Subsea Spool Installation | PT. TIMAS SUPLINDO (PHE ONWJ) | Java Sea |
Provision of SAT Diving Services for HCML MDA & MBH Project | 05 July – 09 August 2017 | SAT Diving Services for pipelaying Riser / Subsea Spool Installation & Hot Tap Installation | PT. TIMAS SUPLINDO (Husky CNOOC – Madura Limited) | Madura Sea |
Provision of Air Diving Services Onboard DLB01 for HCML MDA & MBH Field Development Project | 06 July – 01 August 2017 | Air Diving Services support for pipelaying Riser / Subsea Spool Installation | PT. TIMAS SUPLINDO (Husky CNOOC – Madura Limited) | Madura Sea |
Provision of air diving Services for Quay Wall Under Water Inspection | 13 January – 21 January 2017 | Survey for inspecting all of quay wall condition from the top till the bottom | PT. McDermott Indonesia | Batam |
Provision of air diving Services for underwater intervention on FPSO Nusantara | 10 January – 14 January 2017 | Diving Support for Blind Flange Installation and supervision service of underwater work for blind flange installation | FSRU Nusantara Regas Satu (PT. Equinox) | Ancol, North Jakarta |
2016
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
DIVING COMPLETE INSPECTION OF FPU PLATFORM AT OFFSHORE MARINE TERMINAL | 14 November 2016 – 27 November 2016 | Air Diving Services for Platform Major Inspection | PETROCHINA (JABUNG) Ltd. | Jabung, Jambi |
Provision of Air Diving Services onboard DLB01 for EPSC1, PHE - 12, PHE-24 and CPP2 Platforms and Pipeline Project | 27 October 2016 – 20 November 2016 | Air Diving Services for Offshore Pipeline & Platform Installation | PT. TIMAS SUPLINDO (PHE-WMO) | West Madura Block Area, East Java |
Provision of SAT Diving Services for PHE-12, PHE-24 and CPP2 PLATFORMS and PIPELINES PROJECT | 27 October, 2016 – 31 October 2016 | Saturation Diving Services for Subsea Spool Installation | PT. TIMAS SUPLINDO (PHE-WMO) | West Madura Block Area, East Java |
Provision of Air Diving Services onboard Hilong HLV for EPSC1, PHE-12, PHE-24 and CPP2 Platforms and Pipeline Project | 6 October 2016 – 4 November 2016 | Air Diving support for Offshore Pipeline & Platform Installation | PT. TIMAS SUPLINDO (PHE-WMO) | West Madura Block Area, East Java |
Provision of SAT Diving Services for StarEnergy – KRA South 2 Infill Well Tie in Project | 17 September 2016 – 13 October 2016 | Saturation Diving Services using 9 Man System for Offshore Pipeline and Offshore Riser, Spool etc installation & Clamps Installation | PT. TIMAS SUPLINDO (STARENERGY) | Natuna Sea |
Provision of Air Diving Services for StarEnergy – KRA South 2 Infill Well Tie in Project | 17 September 2016 – 12 October 2016 | Air Diving for Stinger Installation | PT. TIMAS SUPLINDO (STARENERGY) | Natuna Sea |
Provision of Saturation Diving Services for BD Madura Field Development Project | 10 August 2016 – 31 August 2016 | Saturation Diving Services for Subsea Spool Installation | PT. TIMAS SUPLINDO (HUSKY OIL) | Madura Sea |
Provision of Air Diving Services for BD Madura Field Development Project | 04 July 2016 – 27 August 2016 | Air Diving Support for offshore pipeline installation | PT. TIMAS SUPLINDO (HUSKY OIL) | Madura Sea |
2015
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
DIVING SERVICES EPCI OF FACILITIES FOR DEVELOPMENT OF THE MADURA BD FIELD | 08 August 2015 – 31 October 2015 | Air Diving Services to support Grout lines and packer inflation lines cutting | COOEC Ltd. (Husky Oil) | Madura Stait, Surabaya |
Air Diving Services for CNOOC Project Asti- Milla Platform and Pipeline Installation’s project | 13 July 2015 – 12 August 2015 | Air Diving support for pipelay installation of 10” gas sealine coated with 3LPP and concrete weight, coating. | PT. Timas Suplindo (CNOOC Ses Ltd) | Central Java |
Air Diving Services for Bekapai Phase 2B EPSC 2 – Pipeline Installation project | 26 May 2015 – 08 July 2015 | Air Diving for Pipelay and spool piece tie in | PT. TIMAS SUPLINDO (TOTAL E&P Indonesia) | East Kalimantan |
Air Diving Services 2011 – 2013 | 22 May 2015 – 03 July 2015 | Underwater Inspection UWILD FPSO Belanak Natuna 2015 (SBM maintenance including subsea & surface hose change out) | ConocoPhillips Ltd. | Natuna Sea |
Provision of Air Diving Services for Kepodang Project Year 2015 | 07 March 2015 – 17 June 2015 | Air Diving services for pipeline installation and spool tie in | SK TL Offshore Sdn Bhd (PT. PGN) | Kepodang, Tambak Lorok – Eastern Java |
Provision of Diving Services | 01 June 2015 - ongoing | Inspection, Maintenance and Repair using Air Diving and ROV for SBM maintenance including subsea & surface hose change out | TOTAL E&P INDONESIA | East Kalimantan |
Provision of Air Diving System | 16 January 2015 – February 2016 | Provision of Air Diving System to support IMR job at PHE ONWJ Field | PT. Seascape Surveys Indonesia (PHE ONWJ) | Java Sea |
2014
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of Saturation Diving Spread Services | 28 October 2014 – 12 December 2014 | Saturation Dive Services for Remedial Subsea Wellhead | PHE ONWJ | Java Sea |
Provision of Air Diving Services for Salvage operation in Samarinda Offshore - TEPI | 19 December 2014 – 06 February 2015 | Recovery hatch cover, placing of cofferdam and sealing of engineroom and etc | SMIT – Boskalis | Samarinda |
Provision of Air Diving Services | 10 September 2014 – 23 September 2014 | Air Diving Services to Support DTF Operation | TOTAL EP INDONESIA | Balikpapan, East Kalimantan |
Provision of SRP Services | Provision of SRP Services | Bottom survey of DSV Skandy Hawk | DOF Subsea Asia Pacific | Balikpapan,East Kalimantan |
Provision of Air Diving & ROV Spread and Technician Personnel to support UWILD project | 20 June 2014 – 10 July 2014 | Provision of Air Diving Services and ROV for the UWILD Inspection on OMNI FPSO | PT. Samudra Biru Nusantara (ConocoPhillips Inc. Ltd) | Natuna Sea |
Rigger Services | 8 May 2014 – 28 May 2014 | Provision of Rigger Services | PT. Pageo Utama (Chevron) | Balikpapan, East Kalimantan |
Provision of Air Diving Services for GG Project | 24 May 2014 – 09 September 2014 | Air Diving Services for Spool Piece Tie in | PT. Rajawali Swiber Cakrawala (PHE ONWJ) | Java Sea, Indonesia |
Air Diving Services 2011 – 2013 (Phase 2014) | 16 May 2014 – 26 May 2014 | Inspection for Riser & Caisson in Belanak WHP-B Platform using mini ROV and air diving services (SBM maintenance including subsea & surface hose change out) | ConocoPhillips Ltd. | Natuna Sea |
Air Diving Services 2011 – 2013 (Phase 2014) | 28 April 2014 – 06 May 2014 | Air Diving Support for underwater Inspection OOB (Oil Offloading Buoy) Belanak and Underwater Inspection Riser and Caisson at WHPA Belanak Platform | ConocoPhillips Ltd. | Natuna Sea |
ROV Services | 18 January 2014 – 9 February 2014 | Pipeline Inspection / as built Survey , Madura Sea | PT. Rajawali Swiber Cakrawala (Santos Field) | Madura Sea |
2013
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of Air Diving Services for the UWILD Inspection on Rig COSL Seeker | 05 November 2013 – 22 November 2013 | UWILD Inspection using Air Diving on Rig COSL Seeker | PT. COSL Indo (PHE WMO) | Surabaya , Madura Sea |
Major Platform Inspection Using Air Diving and ROV Services | 19 October 2013 – 29 October 2013 | Major Platform Inspection – by Air Diving & ROV | Camar Resources Canada Inc. Ltd | Surabaya , Madura Sea |
Supply of Air Diving System | 03 September 2013 – 09 October 2014 | Provision of Air Diving System to support IMR job at PHE ONWJ Field | PT. Seascape Surveys Indonesia (PHE ONWJ) | Java Sea, Indonesia |
Provision of Diving Services – IMR Project | 01 July 2013 – 31 July 2015 | Diving Services (Inspection , Repair and Maintenance)using TMS ROV SuperMohawk & Air Diving Services (SBM maintenance including subsea & surface hose change out) | TOTAL E&P Indonesie | East Kalimantan |
Air Diving Services 2011 – 2013 (Phase 2013) | 29 July 2013 – 24 October 2013 | Air Diving Services for UWILD FPSO Belanak Natuna, UWILD FSO Intan , Krisi Riser and Caisson Inspection Krisi CPP Platform, Weld Join Inspection Belida LGP Jacket, and OOB SBM Underwater Inspection | ConocoPhillips Indonesia | Natuna Sea, Indonesia |
Saturation Diving Services | 21 May 2013 – 06 July 2013 | Saturation Diving (SAT 7) Remedial Work on Subsea Wellhead | ConocoPhillips Indonesia | Natuna Sea, Indonesia |
Saturation Diving Services | 19 March 2013 – 18 June 2013 | Saturation Diving Services (SAT 4) to support construction work (Pipeline and spool tie in) | PT. Rajawali Swiber Cakrawala (PHE WMO) | Gresik, Surabaya |
2012
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
IMR Project | 09 June 2012 – 10 December 2012 | Inspection, Maintenance and repair Services using ROV and Air Diving (DP2Vessel) | PHE ONWJ | Java Sea - Indonesia |
Saturation Diving Services | 4 April 2012 – 21 May 2012 | Saturation Diving Services for New NUI Platforms and pipeline of APN-E/F New Field Development | SMIT Int. – Orient Blossom Pte Ltd | Java Sea - Indonesia |
Air Diving Services 2011 – 2013 (Phase 2012) | 11 April 2012 – 20 April 2012 | Air Diving Support for Underwater Inspection Ramba Jetty Structure | ConocoPhillips Ltd. | Ramba Jetty, Jambi |
Provision of Air Diving and ROV Services | 25 May 2012 – 13 November 2012 | Provision of Emergency Call Off Diving Services and ROV for pipeline Repair | Pertamina Hulu Energi ONWJ | Java Sea - Indonesia |
2011
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision of ROV Services | 10 December 2011 – 01 February 2012 | ROV survey for pipeline (Free span survey) | PT. Warma Trierindo (Santos) | Madura - East Java |
ROV Services | 27 October 2011 – 26 November 2011 | ROV barge supply services for pipeline installation | PT. Punj Llyod Indonesia (PHE ONWJ) | Java Sea – Indonesia |
Pipelay Project | 29 September 2011 – 03 December 2011 | Saturation Diving for Pipelay, Riser Tie in | Clough – Timas (Kodeco) | Surabaya , Madura Sea |
Air Diving Services 2011 – 2013 (phase 2011) | 07 September 2011 – 17 September 2011 | Air Diving Services for ARMAWRAP Removal, UT thickness measurement and installation | ConocoPhillips Indonesia | Ramba Jetty, Jambi - Indonesia |
Provision of ROV Services | 24 September 2011 – 01 October 2011 | ROV Services for Inspection and Survey of Subsea Wellhead | PT. Seascape Indonesia (TOTAL EP Indonesia) | Balikpapan |
Provision Of Emergency Air Diving And ROV Services | 25 July 2011 – 21 August 2011 | Provision Of Emergency Air Diving And ROV Spread Services | PHE ONWJ | Java Sea, Indonesia |
Provision Of Emergency Air Diving And ROV Services | 18 May 2011 – 10 June 2011 | Provision Of Emergency Air Diving And ROV For Zud Riser Repair | PHE ONWJ | Java Sea, Indonesia |
Provision Of Emergency Air Diving And ROV Services | 04 March 2011 – 13 March 2011 | Provision Of Emergency Air Diving And ROV Services For Debris Removal | PHE ONWJ | Java Sea, Indonesia |
Belanak LPG FSO Calm Buoy Recovery Work | 13 January 2011 – 14 March 2011 | Saturation and Air Diving Services for Recovery of Sunken SBM | ConocoPhillips Indonesia | Natuna Sea – Indonesia |
2010
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Diving Services | 02 December 2010 – 30 June 2013 | Air Diving and ROV Services (Inspection , Repair and Maintenance) & SBM Maintenance Incl. Subsea & Surface Hose Change Out | Total E&P Indonesie | East Kalimantan |
Air Diving Services | July 2010 & September 2010 | Air Diving for Pipeline and Riser Repair | Petrochina International Jabung Ltd | Jambi - Indonesia |
Pertamina / BP ONWJ Pipeline repair / Java | December 2009 – May 2010 | Air Diving support for pipeline installation | CATHEM / Pertamina | Java Sea - Indonesia |
Heera Redevelopment Project-Phase-II | 3 October 2009 – 11 May 2010 | Saturation Diving Support for Pipeline and SBM Installation and platform /pipeline inspection job, Riser Clamp, conductor, subsea spool, composite cable installation onboard Barge Madhawa and Barge Mahesh | Oil & Natural Gas Corp. Ltd/ Punj LIoyd India | India |
Project Name | Date | Scope of Work | Client | Location |
---|---|---|---|---|
Provision ROV Observation for Support JSN Saturation Job | 18 November 2021 - 26 April 2022 | Provision ROV Observation for Support JSN Saturation Job | PT. Meindo Elang Indah (PT Pertamina Hulu Mahakam) | Sisi Nubi and South Mahakam Field, East Kalimantan |
Provision of SAT Diving Services for Medco Belida Project | 02 November 2021 - 14 November 2021 | Saturation Diving Services onboard Crest Odyssey-1 for installation activities related to Pipeline spool dismantling and Riser Testing. Removal of spool piece & wet store and Installation of blind flange. | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Belida Field, Natuna Sea |
Provision of SAT Diving Services for Medco HIU Project | 15 November 2021 - 28 November 2021 | Saturation Diving Services onboard Crest Odyssey-1 for installation activities related to EDU & SCM replacement and flying leads installation. Removal of flying leads prior to EDU & SCM replacement & reinstatement afterwards. Removal of existing EDU & SCM and Installation of new units. | PT. Timas Suplindo (Medco E&P Natuna Ltd.) | Hiu Field, Natuna Sea |
Provision for Saturation & Air Diving for Subsea Works for Engineering, Procurement, Supply, Construction and Commissioning Contract for North Sisi North Nubi and Jumelai Project PT Pertamina Hulu Mahakam | 13 November 2021 - 27 April 2022 | Saturation Diving Services onboard Accommodation Work Barge (Subsea Spool Installation and Riser Clamp Installation) at JML-1, WPS-3, MWPS, WPN-4, and WPS-2 platform. Saturation diving activities shall cover supporting for pipeline flooding / preservation, disconnect 85T shackle and sacrificial wire 60mm from pipeline head, dismantle & recover temporary flange protector, take fix position using USBL for position, Subsea spool metrology, pipeline head dismantle, bottom riser flange recovery, subsea spool installation, Kamos test and for others spool installation. | PT. Meindo Elang Indah (PT Pertamina Hulu Mahakam) | Sisi Nubi and South Mahakam Field, East Kalimantan |
Air Diving Services | 03 November 2021 - 30 November 2021 (3rd Campaign) | Air Diving Services for Support Belanak Oil Offloading Buoy (OOB) floating hose Maintenance Program 2021. | Medco E&P Natuna Ltd. | Natuna Sea |
Provision for Air Diving System Onboard KP-1 for Engineering, Procurement, Supply, Construction and Commissioning Contract for North Sisi North Nubi and Jumelai Project PT Pertamina Hulu Mahakam | 09 October 2021 - 16 January 2022 | Air Diving Services onboard DLB Armada KP1 for Pipeline Installation, Stinger check 3 pipeline segments (JML-1 to MD-1 7 km, WPS3 to MWPX 4,3 km, WPN4 to WPS2 5 km), Assistance to Marine spread, Air diving assistance to be required for cutting the rope which attached to the sling that wrap Norwegian buoy in start-up head and laydown head after pass the stinger. | PT. Meindo Elang Indah (PT Pertamina Hulu Mahakam) | Sisi Nubi and South Mahakam Field, East Kalimantan |
Provision of Air Diving Onboard EN3000 Transportation and Installation of Dai Nguyet Wellhead Platform (DN-WHP), Flexible Pipeline & Subsea Cable PTSC Mechanical and Construction Limited Company | 12 August 2021 - 27 September 2021 | Air Diving Onboard EN3000 for DN Jacket Installation Assistance, Air diving may require to assist jacket installation and other tasks instructed by CONTRACTOR Barge Superintendent up to WD within air diving capability. Assistance to Marine Spread (Contingency), Air diving assistance shall be available during jacket installation which will be laid by DLB Eka Nusantara 3000. | PT. Meindo Elang Indah (Idemitsu Gas Producation (Vietnam) Co. Ltd) | Nam Con Son Basin, Vietnam |
Provision for Air Diving and ROV Operation Onboar EN3000 for Engineering, Procurement, Supply, Construction and Commissioning Contract for North Sisi North Nubi and Jumelai Project PT Pertamina Hulu Mahakam | 12 April 2021 - 30 May 2021 | Air Diving and ROV Observation Services onboard EN3000 for jacket installation assistance, flooding system removal, assistance to marine spread (contingency), Jacket pre-installation survey using ROV, ROV monitoring assistance during jacket lifting and Jacket post installation survey (anodes, mud mat and riser clamps) | PT. Meindo Elang Indah PT Pertamina Hulu Mahakam | Sisi Nubi and South Mahakam Field, East Kalimantan |
Provision for Air Diving System and Work Class ROV Operation Onboard KP-1 for Provision of Engineering, Procurement, Construction, Installation and Commissioning of BTJT-B Wellhead Platform, Infield Pipelines and Host Tie-In Modification for Bukit Tua Phase 2B Development Project PC Ketapang II Ltd | 03 April 2021 - 06 September 2021 | Air Diving and Work Class ROV Services onboard KP-1 for Pipeline Installation, stinger check, assistance to marine spread, cutting the rope which attached to the Sling of Norwegian Buoy at 6” startup head and laydown head, pipeline profile checks and pipeline touchdown monitoring, cutting sacrificial sling and recovery of beacons installed on pipeline after final lay down. | PT. Meindo Elang Indah (PC Ketapang II Ltd) Under PGN-SAKA Indonesia Pangkah Limited) | Bukit Tua Field, Madura Sea |
Provision of Engineering, Procurement, Construction, Installation, and Commissioning of BTJT-B Wellhead Platform, Infield Pipelines and Host Tie-In Modification for Bukit Tua Phase 2B Development Project PC Ketapang II Ltd | 09 February 2021 - 31 March 2021 | Air Diving and ROV Observation Services onboard EN3000 for Jacket Installation assistance, flooding system removal, assistance to marine spread (contingency), Jacket pre-installation survey using ROV, ROV monitoring assistance during jacket lifting and Jacket post installation survey. | PT. Meindo Elang Indah (PC Ketapang II Ltd) | Bukit Tua Field, Madura Sea |
Provision of Saturation Diving Services for Merakes EPCI-2 Tie-In Scope (Merakes Technip) | 06 February 2021 -12 March 2021 | Provision of Saturation Diving Services for Merakes EPCI-2 Tie-in Scope (Merakes Technip) Support Services for Divers Tie-in operations, Flexible Riser Pigging and Flooding & Flying Leads Installation by Divers) | PT. Timas Samudera Indonesia (Technip FMC-Under ENI East Sepinggan Ltd) | The East Sepinggan Block, Merakes, East Kalimantan |
Provision of SAT Diving Services for ENI Merakes EPCI-4 TSJV Project | 21 December 2020 - 05 February 2021 | Provision of Saturation Diving Services for ENI Merakes EPCI-4 TSJV Project EPCI-4 (Provision and Installation of Pipeline, ILT, PLETs & Pre-commissioning Activities). | PT. Timas Samudera Indonesia (ENI East Sepinggan Ltd) | The East Sepinggan Block, Merakes, East Kalimantan |
Saturation Diving Services for Crane Boom Recovery | 25 November 2020 - 18 February 2021 | Provision of Saturation Diving services for recovery LTS3000 crane boom salvage | T&T Salvage Asia Pte. Ltd. | Mumbai High, India |